Meeting No. 1 - November 3, 2005:

  1. Agenda [28.43 Kb]
  2. Preliminary Packet to Steering Committee
    1. Agenda
    2. Preliminary Study of Interchange Alternatives - October 2000
      1. Full Document  [15.59 Mb]
        (Note: The full report is 16mb and may take an extended period of time to download. We have divided the report into sections, so that it is easier to access with dial-up connections.)
      2. Cover [760.05 Kb]
      3. Study Introduction [3.26 Mb]
      4. Interchange Alternatives [1.41 Mb]
      5. Traffic Analysis and Summary [1.17 Mb]
      6. Interchange Alternative Illustrations
        1. Alternative 1 [993.35 Kb]
          Eastern Parclo
        2. Alternative 2 [1000.07 Kb]
          Diagonal Parclo
        3. Alternative 3 [988.54 Kb]
          Eastern Parclo w/ Roundabouts
        4. Alternative 4 [986.28 Kb]
          Diamond w/ Roundabouts
        5. Alternative 5 [862.28 Kb]
          Tabletop Roundabout
        6. Alternative 6 [852.17 Kb]
          Double-bridge Roundabout
      7. Recommendations [2.68 Mb]
    3. Entrance Corridor Guidelines [596.04 Kb]
  3. Meeting Materials
    1. Steering Committee Information [80.96 Kb]
    2. Project Team Information [345.33 Kb]
    3. Presentation Slides [2.56 Mb]
    4. Feedback from Steering Committee Interviews [164.30 Kb]
    5. Draft Purpose and Need [35.46 Kb]
    6. Draft Goals and Objectives [35.92 Kb]
    7. Preliminary Project Scope and Schedule [182.44 Kb]
    8. Reference Documents [9.24 Mb]
  4. Meeting Summary [59.36 Kb]

Photos from 1st Steering Committee Meeting

Route 250 Bypass Interchange
at McIntire Road


Steering Committee Kick-off Meeting held on November 3, 2005
at the Downtown Visitor Center in Charlottesville, VA.

Go to top